Skip to content

ISO 9001:2015 aligned · Full traceability

Quality systems

Precision, traceability and process control in every part

Quality is not inspected into the product — it is engineered into the process. Every part flows through an 8-stage inspection gate system, backed by 80+ controlled documents, and serves automotive, EV, medical, electronics and export OEM programmes.

8
Inspection gates
80+
Controlled documents
14
Process categories
PPAP
APQP · FMEA · control plans

The 8-stage inspection gate system

Every part passes the same sequence — from incoming resin to packed dispatch. Hover a gate to see its checks.

01

Incoming Material

  • Raw-material verificationMoisture content checkGrade certification
02

Sheet Quality

  • Thickness uniformitySurface finish checkColour consistency
03

First Article (FAI)

  • Tooling validationParameter setupPre-production approval
04

In-Process SPC

  • Every 25 pieces checkedCycle-time monitoringVisual defect scan
05

Dimensional Check

  • Metrology-lab verification3D-scanning validationTolerance compliance
06

Surface Quality

  • 100% visual inspectionScratch / dent freeTexture consistency
07

Final Inspection

  • Gate-check releaseAssembly fitmentCleaning & finishing
08

Packaging

  • Label verificationProtective-film applicationQuantity count

A documented quality management system

80+ controlled documents across 14 process categories — ISO 9001 certified, with APQP, PPAP and FMEA. Hover a category to see the documents.

7

Quality Manual & Control

Quality Policy, Manual, Document Control, Records Control, Master Register, Org Chart

8

Supplier Management

Vendor list (AVL), supplier evaluation, incoming verification, PCN tracking

4

Mould Making (VMC)

Mould-design SOP, VMC setup, mould history card, inspection report

11

Thermoforming Production

Order planning, job traveler, setup sheets, SPC charts, material segregation

5

Inspection & Testing

Inspection control, receiving checklist, first-off report, final inspection

5

CAPA & Non-Conformance

NCR process, root-cause analysis (5-Why), corrective action, effectiveness check

4

Calibration & PM

Calibration control, equipment register, preventive-maintenance schedule

3

Training & Competence

Competence assessment, skills matrix, training records

4

Internal Audits

Audit SOP, ISO 9001 checklist, audit schedule, findings report

3

Management Review

MR SOP, agenda & minutes, KPI dashboard, performance summary

7

Risk & NPI

Risk management, PFMEA, control plans, APQP, PPAP submission, stage-gate

4

Support & Reference

Customer-requirements register, HSE, contingency plan, traceability

4

Customer Satisfaction

Feedback handling, delivery protection, satisfaction survey

10

Ethics & Compliance

Code of conduct, anti-bribery, labour policies, safety, HR manual

COA, MTC, FAIR and PPAP submission packs available with every programme. See order lifecycle & traceability →

Standards & compliance

40+ years of process discipline, engineering validation and production repeatability that OEM and export programmes demand.

ISO 9001
Quality management
ISO 14001
Environment
ISO 45001
Health & safety
CE Marking
European compliance
RoHS / REACH
Substance compliance
FDA
Food-contact materials
UL 94
Flammability (V-0)
Rail HL3
EN 45545 fire
Request quality documentation